Dissatisfaction and unclear needs in the process
If you want to set up a new client or take over the movement data of the productive system in a development system, you should also consider the modification documents. If you have a client copy, you should first delete the indexing of the change documents (table SUIM_CHG_IDX), since you can restore the indexing after the copy. To do this, use the SUIM_CTRL_CHG_IDX report without selecting a date and check the Reset Index box. After the copy has been made, delete the change documents that are dependent on the client; This also applies to the client-independent change documents (e.g., proposed permissions, table logs) if you have copied the client to a new system. In addition, you should remove the shadow database alterations before copying the client and complete the index build after the copy. In any case, check the Reset Index box in the SUIM_CTRL_CHG_IDX report!

In compliance with the minimum principle and the separation of functions, the roles used must be defined, along with specifications for their naming, structure and use. Close attention should also be paid to the application and allocation process in order to prevent authorization conflicts, which arise primarily as a result of employees' changing or expanding areas of responsibility.
Mitigating GRC risks for SAP systems
However, the preferred and more comprehensive variant of a programmatic permission check is the use of the AUTHORITY_CHECK_TCODE function block. This function block not only responds to a missing permission when the programme starts, but can also specify that only the NO-CHECK check marks maintained in the transaction SE97 allow external calling from another transaction context. This is determined by the function block and not by the developer.

Are you using the result and market segment statements and need permission checks for combinations of characteristics and key figures not included in the standard? To do this, create specific authorization objects. You can define key figures and result objects (groups of characteristics) for the planning and information system in the result and market segment calculation (CO-PA). You may also want to control permissions by using these characteristics or key numbers. This cannot be reflected with the default authorization objects. Therefore, create authorization objects in the customising of the result invoice.

Secure your go-live additionally with "Shortcut for SAP systems". You can assign necessary SAP authorizations quickly and easily directly in the system.

However, this was only possible for FI with additional programming.

You can also find some useful tips from practice on the subject of SAP authorizations on the page www.sap-corner.de.


One or more persons can hold a role and thus have the access authorizations assigned to the role.